{"id":3959,"date":"2021-09-13T23:59:43","date_gmt":"2021-09-14T06:29:43","guid":{"rendered":"http:\/\/kic.gov.mm\/?p=3959"},"modified":"2021-09-13T23:59:43","modified_gmt":"2021-09-14T06:29:43","slug":"kayah-state-investment-monitoring-team-conducts-field-inspection-via-video-conferencing","status":"publish","type":"post","link":"https:\/\/kic.gov.mm\/en\/kayah-state-investment-monitoring-team-conducts-field-inspection-via-video-conferencing\/","title":{"rendered":"Kayah State Investment Monitoring Team Conducts Field Inspection via Video Conferencing"},"content":{"rendered":"<p>Kayah State Investment Monitoring Team conducted field inspection on power generation, transmission and distribution with BOT by building hydropower plant \u201cNo(3) Beluchaung\u201d by Future Energy Company Limited at Loikaw, Kayah State via video conferencing on 14<sup>th <\/sup>September, 2021. During the inspection, the team coordinated the requirements of the project.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3960 size-full\" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-scaled.jpeg\" alt=\"\" width=\"2560\" height=\"1722\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-scaled.jpeg 2560w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-300x202.jpeg 300w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-1024x689.jpeg 1024w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-768x517.jpeg 768w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-1536x1033.jpeg 1536w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/20210914_111227-01-01-2048x1378.jpeg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3962 size-full\" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01.jpeg\" alt=\"\" width=\"1600\" height=\"1200\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01.jpeg 1600w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01-300x225.jpeg 300w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01-1024x768.jpeg 1024w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01-768x576.jpeg 768w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2021\/09\/IMG-048090c3dcb419bc505e1284e2473499-V-01-1536x1152.jpeg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kayah State Investment Monitoring Team conducted field inspection on power generation, transmission and distribution with BOT by building hydropower plant \u201cNo(3) Beluchaung\u201d by Future Energy Company Limited at Loikaw, Kayah State via video conferencing on 14th September, 2021. During the inspection, the team coordinated the requirements of the project.<\/p>\n","protected":false},"author":5,"featured_media":3964,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[58,33],"tags":[],"_links":{"self":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3959"}],"collection":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/comments?post=3959"}],"version-history":[{"count":1,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3959\/revisions"}],"predecessor-version":[{"id":3966,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3959\/revisions\/3966"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media\/3964"}],"wp:attachment":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media?parent=3959"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/categories?post=3959"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/tags?post=3959"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}