{"id":3686,"date":"2020-12-27T22:12:51","date_gmt":"2020-12-28T04:42:51","guid":{"rendered":"http:\/\/kic.gov.mm\/?p=3686"},"modified":"2020-12-27T22:12:51","modified_gmt":"2020-12-28T04:42:51","slug":"field-inspection-to-square-power-group-company-limited","status":"publish","type":"post","link":"https:\/\/kic.gov.mm\/en\/field-inspection-to-square-power-group-company-limited\/","title":{"rendered":"Field Inspection to \u201cSquare Power Group Company Limited\u201d"},"content":{"rendered":"<p>Members of Kayah State Investment Monitoring Team conducted field inspection on manufacturing of cement which is provided (4000) ton in a day by Square Power Group Company Limited at Demoso in Kayah State on 26<sup>th <\/sup>December, 2020. During the inspection, the team coordinated the requirements of the project.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3687 size-full\" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128366695.jpg\" alt=\"\" width=\"960\" height=\"720\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128366695.jpg 960w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128366695-300x225.jpg 300w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128366695-768x576.jpg 768w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3689 \" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128368417.jpg\" alt=\"\" width=\"965\" height=\"1287\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128368417.jpg 720w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2020\/12\/FB_IMG_1609128368417-225x300.jpg 225w\" sizes=\"(max-width: 965px) 100vw, 965px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Members of Kayah State Investment Monitoring Team conducted field inspection on manufacturing of cement which is provided (4000) ton in a day by Square Power Group Company Limited at Demoso in Kayah State on 26th December, 2020. During the inspection, the team coordinated the requirements of the project.<\/p>\n","protected":false},"author":5,"featured_media":3691,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[58,33],"tags":[],"_links":{"self":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3686"}],"collection":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/comments?post=3686"}],"version-history":[{"count":1,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3686\/revisions"}],"predecessor-version":[{"id":3693,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3686\/revisions\/3693"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media\/3691"}],"wp:attachment":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media?parent=3686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/categories?post=3686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/tags?post=3686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}