{"id":3065,"date":"2019-12-16T23:56:15","date_gmt":"2019-12-17T06:26:15","guid":{"rendered":"http:\/\/kic.gov.mm\/?p=3065"},"modified":"2019-12-16T23:56:15","modified_gmt":"2019-12-17T06:26:15","slug":"field-inspection-to-kayan-star-company-limited","status":"publish","type":"post","link":"https:\/\/kic.gov.mm\/en\/field-inspection-to-kayan-star-company-limited\/","title":{"rendered":"Field Inspection to \u201cKayan Star Company Limited\u201d"},"content":{"rendered":"<p>Members of Kayah State Investment Monitoring Team conducted field inspection on providing services by construction of hotel by Kayan Star Company Limited at Loikaw, Kayah State on 16<sup>th <\/sup>December, 2019. During the inspection, the team coordinated the requirements of the project.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3074 size-full\" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/79759761_464658554191213_1779890144598294528_n.jpg\" alt=\"\" width=\"768\" height=\"1032\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/79759761_464658554191213_1779890144598294528_n.jpg 768w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/79759761_464658554191213_1779890144598294528_n-223x300.jpg 223w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/79759761_464658554191213_1779890144598294528_n-762x1024.jpg 762w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-3076 size-full\" src=\"http:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/80039822_1470957969736759_1396186382078050304_n.jpg\" alt=\"\" width=\"768\" height=\"1032\" srcset=\"https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/80039822_1470957969736759_1396186382078050304_n.jpg 768w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/80039822_1470957969736759_1396186382078050304_n-223x300.jpg 223w, https:\/\/kic.gov.mm\/wp-content\/uploads\/2019\/12\/80039822_1470957969736759_1396186382078050304_n-762x1024.jpg 762w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Members of Kayah State Investment Monitoring Team conducted field inspection on providing services by construction of hotel by Kayan Star Company Limited at Loikaw, Kayah State on 16th December, 2019. During the inspection, the team coordinated the requirements of the project.<\/p>\n","protected":false},"author":5,"featured_media":3078,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[58,33],"tags":[],"_links":{"self":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3065"}],"collection":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/comments?post=3065"}],"version-history":[{"count":1,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3065\/revisions"}],"predecessor-version":[{"id":3080,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/posts\/3065\/revisions\/3080"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media\/3078"}],"wp:attachment":[{"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/media?parent=3065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/categories?post=3065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kic.gov.mm\/en\/wp-json\/wp\/v2\/tags?post=3065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}